Entities compared
| Entity | Revenue | Gross profit | Operating expenses | Net result | Cash | Receivables overdue |
|---|
| Group | Revenue | Gross profit | Operating expenses | Net result | Cash | Receivables overdue |
|---|
Profit and loss columns exclude GST; cash and receivables are ledger balances including GST. The simple sum of entities is not the consolidated result: the eliminations row removes intercompany trading identified between the entities, and is indicative only, not approved by finance.
Gross profit is as Xero reports it. Wages sit under operating expenses in the ledgers, so it excludes direct labour and overstates job margin.
| Line | Amount | % of revenue |
|---|
| Line | Amount | % of revenue |
|---|
Profit and loss
Account: —
| Account | Sum of entities | Eliminations | Year to date | % of revenue |
|---|
| Account | Year to date | Last year | Change | % of revenue |
|---|
Booked actuals from the Xero ledger for the financial year to date, provisional until finance closes the period. With Group selected, figures are the three entities after indicative intercompany eliminations. The eliminations are not approved accounting.
Comparisons are with the same dates last year. Projects (created 27 August 2026) and Hire (created 27 January 2026) have no prior-year figures, and Group has no like-for-like prior year, so those comparisons are blank rather than set against Contractors alone.
Gross profit is income less cost of sales as the ledgers hold them. Wages sit in operating expenses, so gross profit excludes direct labour. Net result is before income tax and includes the part-month of the current month.
Section totals are summed from the account rows and agree to Xero's own totals. Last year is the same dates a year earlier. Contractors' prior-year income sat in one account (Sales) and is now split across several, so compare income and totals, not individual account lines. Last year is the same dates a year earlier; it is blank where the entity did not exist, and the Last year and Change columns are not shown for Group because Projects and Hire did not exist then, so there is no like-for-like prior year.
For Group the first column is the simple sum of the three entities, the second the indicative intercompany eliminations (see the eliminations table below) and the third the consolidated figure. INDICATIVE: the eliminations are not approved accounting, and any difference between the two sides of an eliminated flow stays in the net result. An elimination line whose account Xero does not identify is shown by name with the reason.
Management view block (Group and Contractors only): progress claims sent, not yet invoiced, come from Simpro and are not in Xero revenue. This is a management view only. A claim sent is not recognised revenue until finance approves a revenue recognition policy. When a claim is invoiced it moves into Xero revenue and leaves this line. The block never feeds booked revenue, gross profit, net result, consolidated totals, ratios or the trend.
By month
Invoices are pushed from Simpro in bulk, so the part-month at the right understates income and shows a loss; do not compare it with full months. For Group, months are consolidated: indicative eliminations sit in the month of the journal or invoice that carries them.
Balance sheet and ratios
| Balance sheet | At the date | A year earlier |
|---|
Not classified: —
Xero rounds the requested date up to the month end, so the date shown is the one Xero reported, not today. Receivables, payables and bank balances include GST. Assets, liabilities and equity are summed from account rows and the balance check is assets minus liabilities minus equity; it should be nil, and any other figure is shown, not adjusted.
Group is the simple sum of the three entity balance sheets, not a consolidated balance sheet: intercompany loans are not eliminated. The prior-year column is blank for an entity that did not exist a year earlier, and for Group, because Projects and Hire did not exist then.
Gross margin is gross profit divided by revenue. Net margin is net result divided by revenue. Operating expense ratio is operating expenses (including wages) divided by revenue. Each is blank when revenue is nil.
Current assets are the Xero balance sheet sections Bank and Current Assets; current liabilities are the section Current Liabilities. Xero's own classification is used and nothing is reclassified: an account in any other section is listed above, not guessed. The current portion of term loans is not split out of non-current liabilities, and intercompany loans are not eliminated for Group, so liquidity may be overstated.
Current ratio is current assets divided by current liabilities. Quick ratio is bank plus the Accounts Receivable account, divided by current liabilities. Working capital is current assets less current liabilities. A ratio is blank when its denominator is zero. No threshold is approved. Debtor and creditor days are on the Cash tab.
Budget
Months not included: —
The budget workbook is not connected yet
No budget entered
| Line | Budget | Actual | Actual less budget | Reading |
|---|
| Line | Budget | Actual | Actual less budget | Reading |
|---|
CFO forecast: Contractors only.
| Line | Forecast | Actual | Actual less forecast | Reading | Full year | To date |
|---|
Headcount not entered
Headcount: budget workbook not connected
Costs fell with volume and the ledger has no month-end accruals, so the EBITDA comparison flatters; read it with revenue.
For Contractors the budget is the CFO forecast (the source, scenario and financial year are named in the caption) whenever it is loaded; if not, the budget workbook, then the Xero budget. Projects and Hire use the budget workbook when entered, otherwise no budget is shown.
CFO forecast comparison. The model counts site labour as a direct cost, but the Xero ledger holds all wages in operating expenses, so only lines that can be defined the same way are compared (mapping proposed, CFO to confirm). Revenue: total, with infrastructure projects matched to Contract Income and Contract Income - Civil Construction and Design, and do and charge to Service Income; any other income account (for example Sales) is shown as not in the forecast. Direct costs excluding labour: the model's materials, subcontractors and labour hire, plant and equipment hire and other direct costs, against Xero cost of sales plus the Xero account Subcontractors - Operating Expenses (it sits in operating expenses in the ledger, but the model holds subcontractors as a direct cost). Labour, all: the model's direct labour plus overhead salaries, against Wages and Salaries, Superannuation, Payroll Tax and Worker Compensation Insurance - iCare. Other overheads: each model overhead line against the Xero accounts of the same name (bracketed account codes removed; a line naming several codes maps to several accounts).
EBITDA is compared on one basis, as close to like for like as the data allows. In: Xero revenue, less cost of sales and Subcontractors - Operating Expenses, less labour, less the mapped overhead accounts, less any other operating-expense account with no forecast line. Out: accounts whose names show interest, borrowing costs, depreciation or income tax; ALL Xero other income (the model's EBITDA has no other-income line); and the one-off Debt Settlement Expense, which the model does not have. Out items are shown on their own rows labelled not in the forecast. The model's net profit after tax is not compared with Xero net profit: tax and depreciation are not booked monthly in the ledger.
Performance variance covers complete forecast months only (months after the model's actuals and before the current part-month). The model's earliest months are actuals (marked model actual), so their variance shows how the ledger has moved since the model was built, a restatement signal and not performance. The part-month shows the actual and the full-month forecast for reference, with no variance and no reading. Where revenue is below forecast, a cost below forecast is labelled Below forecast, not Favourable: it reflects lower volume, not a saving. Reading is favourable when income is above forecast or cost below it. Achieved to date is revenue to date, including the part-month, over the full-year forecast.
The budget comes from the budget workbook when it is connected and has rows for the entity; otherwise from the Xero budget where one exists (Contractors only); otherwise no budget is shown. Year-to-date budget covers complete months only: the current part-month is left out, and actuals are the same months from the Xero monthly profit and loss.
Variance is actual minus budget. More income than budget is favourable and more cost than budget is unfavourable. A line with no budget entered is blank, never zero, and a total is blank when any part of it is blank. Group is the sum of the entities before eliminations, shown only when every entity has a budget over the same months.
The Xero budget for the months already closed (July to September 2026) equals the actuals to within a few dollars, so variance there is meaningless; only later months are forecasts. The Xero budget also holds income tax expense, which has no line in the actual profit and loss, so it is left out and both net results are before tax. The Xero budget has no June column.
Headcount is entered by the Director in the budget workbook (sheet Headcount), one figure per entity per month. Average headcount is the mean of the months entered from July to the current month; months with no entry are skipped. For Group it is the sum of the entity averages and is blank unless every entity has headcount entered. Net result is before tax and includes the part-month; for Group it is consolidated after indicative eliminations. Headcount is as entered and has not been checked.
Proposed mapping, CFO to confirm. Lines the model does not hold, and Xero accounts it does not hold, are listed with their amounts.
| Forecast line | Xero accounts | Full year | Actual to date |
|---|
| Not compared | Name | Amount |
|---|
Intercompany
| Flow | Seller side | Buyer side | Difference | Evidence |
|---|
| Loan | Receivable | Payable | Difference | Evidence |
|---|
INDICATIVE, not approved accounting; finance must review before any reliance. Each flow removes the seller's revenue and the buyer's cost from the consolidated figures. Both sides are removed in full, so a disagreement between them moves the consolidated net result by exactly that amount: it is shown as an unreconciled intercompany difference and never balanced away.
Flows tied: labour recharge Projects to Contractors (month-end journals), vehicle hire Hire to Contractors (Contractors journals against the whole Hire Other Revenue line; the Hire postings cannot be traced because Xero has not granted journal access), equipment hire invoices both ways and the Contractors invoice to Hire (authorised and paid documents only). The Contractors recharge to Hire is listed but not eliminated because the Hire side cannot be identified.
Loan balances come from the balance sheets, are not eliminated, and a difference between the two sides is unreconciled.
Profit bridge
Break-even
| Measure | Amount |
|---|
| Measure | Amount |
|---|
Progress claims
Contractors only
| Claim | Customer | Job | Sent | Age | Amount ex GST | Status |
|---|
Claims sent, not invoiced (Group and Contractors only) are Simpro requests for claim that have not become a tax invoice, oldest first. Not added to gross profit, net result, ratios or the trend. Management view only: not in Xero revenue, and a claim sent is not recognised revenue until finance approves a revenue recognition policy. When a claim is invoiced it moves into Xero revenue and leaves this list.
"May already be invoiced" means an invoice that looks like the same claim exists, shown beside it; finance must confirm before the claim is treated as outstanding. Age is days since the date sent.
| Customer | Overdue | Oldest, days |
|---|
Bank accounts
Account picked: —
| Entity | Account | Opening | Received | Spent | Closing | Received this month | Spent this month |
|---|
| Entity | Card | Closing |
|---|
| Entity | Account | Balance |
|---|
Cash is the sum of the bank ledger accounts in Xero at the cut-off. It is the ledger balance, not live available funds, and excludes credit cards and term deposits. A cash flow statement is not available from Xero on this connection, so there is no cash flow view here.
Bank summary from Xero: opening balance at 1 July, money received and spent, and closing balance at the cut-off; the month columns cover the current month only. Opening plus received less spent equals closing.
The balance sheet rounds the reporting date up to the month end, so a bank closing balance can differ from the balance sheet figure. The difference is shown against every account in the table below, and per entity in Ties to the balance sheet.
Accounts are classed from the balance sheet: bank accounts sit under Bank, credit cards under liabilities. Card balances keep the bank summary sign: negative means owing. Term deposits are balance sheet current assets named Term Deposit, at the balance sheet date, and any other current asset named for a company is listed as held with a named company. None of these is counted in cash.
Receivables
| Window | Amount | Invoices |
|---|
| Rank | Customer | Outstanding | Overdue | Share | Invoices |
|---|
Customer picked: —
| Invoice | Reference or job | Date | Due | Days overdue | Total | Amount due |
|---|
Receivables and payables are open invoices and bills, amount due after credits and part payments, inc GST. With Group selected they exclude intercompany balances; with one entity selected they include them as booked. Retentions and disputes are not captured in Xero, so they are not shown or adjusted for.
Debtor days and creditor days are proposed approximations, not approved measures. Debtor days = receivables outstanding inc GST divided by (financial-year-to-date revenue ex GST x 1.1), times days elapsed in the financial year. Creditor days = payables outstanding inc GST divided by ((cost of sales plus operating expenses, excluding wages, superannuation and payroll tax accounts) ex GST x 1.1), times days elapsed. The 1.1 gross-up assumes every item carries GST, and balances include intercompany amounts before eliminations.
GST check on the debtor days gross-up: —
Ageing is by due date, after credits and allocations: Current is not yet due, then 1–30, 31–60, 61–90 and 90+ days past the due date. Unallocated credit notes, overpayments and prepayments are shown separately and are not netted into the buckets or the totals. Retentions and disputes are not captured in Xero.
Click a customer to list its invoices; with none picked the table shows the 25 largest by amount due. Customers are matched by name. Invoice numbers link to the record in Simpro where the invoice has one. Receipts falling due are cumulative from the cut-off date and, with Group selected, exclude intercompany.
Payables
Creditor days —iProposed approximation, not an approved measure: payables over the cost base, times days elapsed.
| Window | Amount | Bills |
|---|
| Rank | Supplier | Outstanding | Overdue | Share | Bills |
|---|
Supplier picked: —
| Bill | Reference | Date | Due | Days overdue | Total | Amount due |
|---|
Debtor days and creditor days are proposed approximations, not approved measures. Debtor days = receivables outstanding inc GST divided by (financial-year-to-date revenue ex GST x 1.1), times days elapsed in the financial year. Creditor days = payables outstanding inc GST divided by ((cost of sales plus operating expenses, excluding wages, superannuation and payroll tax accounts) ex GST x 1.1), times days elapsed. The 1.1 gross-up assumes every item carries GST, and balances include intercompany amounts before eliminations.
Receivables and payables are open invoices and bills, amount due after credits and part payments, inc GST. With Group selected they exclude intercompany balances; with one entity selected they include them as booked. Retentions and disputes are not captured in Xero, so they are not shown or adjusted for.
Accounts excluded from the creditor base (financial year to date, ex GST): —
Ageing is by due date, after credits and allocations. Unallocated supplier credit notes and prepayments are shown separately and are not netted into the buckets or the totals. Retentions and disputes are not captured in Xero.
Click a supplier to list its bills; with none picked the table shows the 25 largest by amount due. Foreign currency bills are converted at the invoice rate. Payments falling due are cumulative from the cut-off date and, with Group selected, exclude intercompany.
Intercompany and checks
| Entity | Cash | Receivables | of which intercompany | Payables | of which intercompany |
|---|
| Holds receivable | Holds payable | Receivable | Payable | Difference | Not matching |
|---|
| Entity | Measure | Here | Balance sheet | Difference |
|---|
| Level | What was found | Value |
|---|
Before eliminations (the simple sum of the entities) includes intercompany receivables and payables; Consolidated excludes them. The eliminations row removes every receivable and payable whose contact is a Nebula entity, on each side separately. The two sides do not mirror exactly, so the net effect is not zero. No cash is eliminated, because bank transfers between entities have not been traced.
Group figures in the headline strip and the tables above exclude intercompany balances. Contacts are matched to an entity by name.
The balance sheet rounds the reporting date up to the month end (as at —), so bank closing balances, which are at the cut-off, may differ from it. Payables are shown less unallocated supplier credits to match the ledger. Foreign currency bills are revalued by Xero separately. Nothing is adjusted to force a tie.
A possible duplicate receivable is listed when an open and a paid invoice match on customer, job reference and amount. It needs a person to confirm; if the paid invoice is the correct one, receivables are overstated by the open amount. A pair is left out when a credit note was allocated to the paid invoice (Heyday J419: invoice 2083a was settled by credit note CN-0594, so 2106 is the live receivable). This check reads the invoice and credit note lists; if either fails to load it is skipped and the other exceptions still show.
High is a value of $100,000 or more or a headline total affected, Medium $10,000 or more, otherwise Low.
All customers
| Customer | Net sales | Invoiced | Credited | Share | Invoices | Outstanding |
|---|
| Contact | Net sales | Invoices | Outstanding |
|---|
Net sales are invoiced sales less credit notes. Invoiced sales are the subtotals (ex GST) of Xero sales invoices dated this financial year with status AUTHORISED or PAID. Credit notes are Xero sales credit notes (ex GST) with status AUTHORISED or PAID, deducted in the month and customer of the credit note date, whichever invoice they were allocated to. They are invoiced revenue, not recognised revenue, and differ from the profit and loss: see the reconciliation below.
Net sales need both the invoice list and the credit note list. If the credit note list does not load, net sales and everything built on it show a failure rather than gross invoiced sales presented as net. Voided, deleted and draft invoices and credit notes are excluded; the invoices are counted in the reconciliation.
An invoice to a contact whose name contains Nebula is treated as intercompany and shown separately, not in these figures. Group figures add the three entities and eliminate nothing else.
Customers are identified by contact name in Xero. Names that differ only by case, punctuation, brackets, spacing or a trailing Pty Ltd / Pty Limited / Ltd are treated as one customer and the spellings are listed under the name. Looser matches are not merged (for example Schneider Electric IT Australia stays separate), so a customer under a quite different name still counts twice. Whether a customer is new this year cannot be established: there is no prior-year invoice list.
Concentration is the share of net sales from the largest one and five customers. No threshold has been approved. Still owed is the GST-inclusive amount due on the same invoices. The sales source holds up to 1,000 invoices per entity and flags if cut off. Figures are unreviewed Xero outputs and provisional.
Net sales = invoiced less credited; share is of external net sales. Outstanding is the GST-inclusive amount still due on the counted invoices; the other columns are ex GST. Where several spellings were merged, the name shown is the one on most invoices and the other spellings are listed under it.
Net sales by month
Five largest customers and all other. With a customer selected, the chart shows that customer alone. A month where credit notes exceed invoices is negative. The current month is month to date and drawn lighter. Invoices are pushed from Simpro in bulk, so it is usually understated.
Customer record
| Number | Type | Date | Status | Subtotal | Due |
|---|
| Job | Invoiced | Credited | Net | Outstanding |
|---|
Every status is listed; only AUTHORISED and PAID count in sales, and other statuses are flagged. Subtotal is ex GST and negative for a credit note; amount due is GST inclusive and blank for a credit note.
Jobs group the AUTHORISED and PAID invoices and credit notes by the Simpro job number at the start of the reference. Documents with no job number are grouped together. Outstanding by job is not shown.
Sales reconciliation
| Entity | Invoiced | Credit notes | Income by journal | Ledger income | Unexplained | Excluded invoices |
|---|
Invoiced is all AUTHORISED and PAID sales invoices, external plus intercompany. Credit notes are all AUTHORISED and PAID sales credit notes dated in the year. Income by journal is intercompany manual-journal income that sits in Income in the entity's own profit and loss (for Projects, the labour recharged to Contractors). It is taken from the intercompany journal list; where that list holds no journal for an entity (Hire) it reads Not evidenced and nothing is assumed. Ledger income is Total Income in the Xero profit and loss for the same dates. Unexplained is invoiced less credit notes plus income by journal less ledger income, shown as it is and not adjusted. The group row is a simple sum with no intercompany elimination.
Unexplained is what the lists cannot explain. They carry no invoice lines, so invoices coded outside income cannot be listed here. A separate live check of Contractors at 14 November found two items in it: invoice INV-0591 to Nebula Hire for $1,259.07 coded to Other Revenue, and a $15,204.39 credit balance on the Sales account (200) whose origin was not established. That check is not a source on this page.
Excluded invoices are voided, deleted and draft invoices, left out of invoiced sales. An entity with no sales invoices in the source but ledger income (Projects) shows its ledger income less any income by journal as unexplained. Hire's vehicle hire income from Contractors is not evidenced on the Hire side, so it stays in Unexplained.
Other reasons a remainder can exist: journals and non-invoice income in the ledger (for example recharges posted by manual journal); timing between document date and ledger posting date; invoices pushed from Simpro twice or altered after the push (see Data trust); retentions or deferred revenue that do not follow the invoice date.
Expenses and suppliers
| Account | Year to date | Share | Last year | Change |
|---|
| Account | Year to date | Share | Last year | Change |
|---|
Selected: —
| Supplier | Owed now | Share | Overdue | Open bills |
|---|
With Group selected these figures are a simple sum of the three entities, before intercompany eliminations, so they are higher than the consolidated figures on Entity financials (operating expenses, for example, include intercompany recharges). Nothing is consolidated here. From the Xero profit and loss, split into cost of sales and operating expenses. This is analysis by account, not by supplier: spend by supplier for the year is not available.
Group rows are a simple sum of the three entities, before intercompany eliminations. Last year is the same dates one year earlier. It shows only where every entity in view traded in that period: Projects and Hire have no figures for it, so it is — for them and for the group. Choose Contractors for year on year. Contractors income and payroll accounts were set up differently last year, so account-level change needs care. Change is this year less last year. Operating expenses include wages and salaries.
This is what is owed now on open (AUTHORISED, unpaid) bills, not what was spent in the year. Supplier spend for the year by supplier is not available: a full-year bill list is too large to load live (Contractors alone has about 1,400 bills this year), and it has not been estimated from open bills.
Foreign currency bills are converted at the invoice rate, an estimate. Overdue means due before the cut-off date. The bills behind a selected supplier are on the Cash and collections tab.
| Job | Customer | Forecast margin | Flag |
|---|
Open jobs
Project manager: — Customer: —
| Job | Customer | Contract value | Invoiced | Cost to date | EAC | Forecast margin | Flags |
|---|
Cards always cover all open jobs (Simpro stage Pending, Progress or Complete). Contract value is the job total ex GST; a variation is its own job with its own value, and Simpro does not say whether a variation is approved, so approval status is not available.
Cost to date is Simpro actual cost: materials plus resources (labour, plant and equipment, overhead). Labour cost basis is not confirmed: it may or may not include super, leave loading, workers compensation or overhead, so cost may be understated and margin overstated. Committed is the remaining committed cost as Simpro reports it; on some jobs it equals the unspent estimate exactly, so components may overlap; to confirm.
Estimate at completion (EAC), proposed and not approved: cost to date + committed + uncommitted cost to complete. Uncommitted cost to complete is the revised estimate less cost to date less committed, nil when negative. The revised estimate is Simpro’s revised budget where one exists (materials and resources separately), otherwise the original estimate.
Forecast margin, proposed and not approved: contract value less EAC; the percentage is that margin over contract value. Awarded backlog, proposed and not approved: contract value less invoiced to date (ex GST), never clamped, so a job invoiced above contract value reduces it. A job with no invoiced figure has no backlog and is left out of both the contract value and the invoiced used for backlog. A missing figure is never treated as zero: jobs with a missing input are left out of that total and counted as excluded.
Invoiced is Simpro’s invoiced value converted to ex GST by the job’s own GST ratio (derived). Cost to date is Simpro actual cost. EAC and forecast margin are proposed and not approved; the margin percentage is under the margin. Labour cost basis is not confirmed.
Cost and margin flags (proposed, not approved): forecast margin below zero (Negative margin); cost to date above the revised estimate (Over estimate); cost to date plus committed above the revised estimate (Exceeds estimate); invoiced above contract value (Over-invoiced); zero contract value with cost booked (Zero value, cost). The revised estimate is Simpro’s revised budget where one exists, otherwise the original estimate.
Record-keeping flags (plain pills, counted separately): due date passed and the job is neither in stage Complete nor carries a completed date (Past due); stage and status disagree (Stage/status), meaning Complete stage with status invoiced or paid in full, Progress or Pending stage with a completed date, or Pending stage with status In Progress. Each row shows at most two flags, then a count; the job record lists all.
Open jobs by forecast margin
Project manager: — Customer: —
| Job | Customer | Contract value | Invoiced | Cost to date | EAC | Forecast margin | Flags |
|---|
Invoiced is Simpro’s invoiced value converted to ex GST by the job’s own GST ratio (derived). Cost to date is Simpro actual cost. EAC and forecast margin are proposed and not approved; the margin percentage is under the margin. Labour cost basis is not confirmed.
Jobs flagged on cost or margin
Project manager: — Customer: —
| Job | Customer | Contract value | Invoiced | Cost to date | EAC | Forecast margin | Flags |
|---|
Cost and margin flags (proposed, not approved): forecast margin below zero (Negative margin); cost to date above the revised estimate (Over estimate); cost to date plus committed above the revised estimate (Exceeds estimate); invoiced above contract value (Over-invoiced); zero contract value with cost booked (Zero value, cost). The revised estimate is Simpro’s revised budget where one exists, otherwise the original estimate.
Record-keeping flags (plain pills, counted separately): due date passed and the job is neither in stage Complete nor carries a completed date (Past due); stage and status disagree (Stage/status), meaning Complete stage with status invoiced or paid in full, Progress or Pending stage with a completed date, or Pending stage with status In Progress. Each row shows at most two flags, then a count; the job record lists all.
Record-keeping flags
— jobs
Project manager: — Customer: —
| Job | Customer | Contract value | Invoiced | Cost to date | EAC | Forecast margin | Flags |
|---|
Cost and margin flags (proposed, not approved): forecast margin below zero (Negative margin); cost to date above the revised estimate (Over estimate); cost to date plus committed above the revised estimate (Exceeds estimate); invoiced above contract value (Over-invoiced); zero contract value with cost booked (Zero value, cost). The revised estimate is Simpro’s revised budget where one exists, otherwise the original estimate.
Record-keeping flags (plain pills, counted separately): due date passed and the job is neither in stage Complete nor carries a completed date (Past due); stage and status disagree (Stage/status), meaning Complete stage with status invoiced or paid in full, Progress or Pending stage with a completed date, or Pending stage with status In Progress. Each row shows at most two flags, then a count; the job record lists all.
Job record
EAC = cost to date + committed + uncommitted cost to complete. Components may overlap; to confirm. Labour cost basis (super, leave loading, workers compensation, overhead) is not confirmed, so labour cost and margin may be misstated.
Revised is Simpro’s revised budget where the job has one, otherwise the original estimate. Simpro gives no revised figure or committed overhead for the parts of resources.
Simpro flags variation jobs but does not say whether a variation is approved: approval status is not available.
The Simpro comparison is shown side by side, not blended. Difference is the dashboard figure less Simpro’s. Simpro’s report uses its own forecast of remaining materials and resources, and its cost to date may not treat overhead the same way.
Forecast build-up
Cost by category
| Category | Estimate | Revised | Actual | Committed |
|---|
Dashboard EAC beside Simpro’s cost-to-complete report
| Measure | Dashboard | Simpro report | Difference |
|---|---|---|---|
| Contract value | — | — | — |
| Cost to date | — | — | — |
| Forecast final cost (EAC) | — | — | — |
| Projected margin | — | — | — |
| Projected margin % | — | — | — |
Simpro comparison not loaded
Not in Simpro’s cost-to-complete report
Flags
Business units
| Business unit | Jobs | Contract value | Backlog | Forecast margin | Flagged | Mixed |
|---|
| Job | Name | Customer | Contract value | Backlog | Forecast margin | Units on the job |
|---|
By project manager
| Project manager | Jobs | Contract value | Forecast margin | Flagged |
|---|
Jobs with no project manager recorded in Simpro group together. A group total leaves out jobs with a missing figure rather than counting them as zero. Forecast margin is proposed and not approved; the percentage under it is over the group’s contract value.
By customer
Customer is the name Simpro holds on the job. A customer total leaves out jobs with a missing contract value rather than counting them as zero.
Cost to complete
| Job | Dashboard EAC | Simpro forecast final cost | Difference | Margin difference |
|---|
Simpro’s cost-to-complete report covers — open jobs, and on — of them the dashboard EAC differs from Simpro’s forecast final cost (by more than $1). The two are shown side by side, not blended. Difference is the dashboard figure less Simpro’s.
Completed this year
| Job | Customer | Completed | Contract value | Estimated margin | Actual margin | Actual less estimate |
|---|
Simpro Project-type jobs invoiced and completed this financial year; Simpro’s completed set does not include Service jobs. Estimated margin is contract value less the revised estimate (original where none); actual margin is contract value less actual materials and resources cost. Labour cost basis is not confirmed. A variation is its own job and shows a Variation marker; its approval status is not available.
| Ref | Title | Status | Weighted |
|---|
Bids
Bid leader: — Status: —
| Ref | Title | Bid leader | Status | Close date | Value | Probability | Weighted | Issues |
|---|
The pipeline is the bid team’s Bid Register in SharePoint, read live; awarded backlog comes from Simpro open jobs (proposed definition, Job performance page). This page ignores the entity filter.
Unweighted pipeline, weighted pipeline and awarded backlog are three separate measures and are never added together.
Only open bids count (status GO/NO GO, In Work, Submitted or Negotiating). Bids with a blank or unrecognised status are shown as “status not recorded” and left out of both totals. An open bid with no value is left out of both totals and listed. An open bid with a value but no probability counts in the unweighted total only and is listed as not weighted.
Weighted value is an expected value, not contracted revenue and not expected cash. Probability is the bid team’s weighting score times client win %, not a calibrated win rate.
On award a bid leaves the open pipeline and becomes backlog once. A won bid with no Simpro job number cannot be tied to its job, so it is listed as a double-counting risk. Won value is the register’s value, not backlog.
Only the Construction sheet carries values and probabilities today; Civil/ASP, Commissioning and Service bids have none and appear under exclusions.
Weighted bids come first, then bids with a value but no probability, then bids with no value. Customer and register notes sit under the title. A close date shown as written could not be read as a date. Probability is the bid team’s weighting score times client win %. Reviews older than — days cannot be flagged until the register has a last-reviewed date; the revised layout adds it and the flag appears then. Only the two most important issues are shown per bid.
Unweighted pipeline. Sum of value for open bids that have one, ex GST, as entered by the bid team.
Weighted pipeline. Sum of value × probability for open bids that have both, each rounded to the cent. Expected value, not contracted revenue or cash. Open bids with a value but no probability are in the unweighted figure only, so the weighted figure is understated by them.
Probability. On the CONSTRUCT sheet it links to the Weighting sheet: the team’s weighting score (row 10) multiplied by the client win % (row 11), divided by 100. A scoring judgement, not a win rate measured from past bids. A few links point at another bid’s column; those bids carry an issue.
Awarded backlog. Simpro open jobs, contract value less invoiced to date, ex GST (proposed, not approved). A different measure from either pipeline figure.
Register issues. Data problems the loader found: blank status, ambiguous or invalid dates, formula-built value, shifted columns, wrongly linked probability, missing value or probability on a submitted bid.
By business unit
Each group has two bars: unweighted and weighted. A group’s weighted bar leaves out bids with no probability. Bids with no value do not appear as bars; they are listed under data gaps.
By bid leader
Each group has two bars: unweighted and weighted. A group’s weighted bar leaves out bids with no probability. Bids with no value do not appear as bars; they are listed under data gaps.
By status
Each group has two bars: unweighted and weighted. A group’s weighted bar leaves out bids with no probability. Bids with no value do not appear as bars; they are listed under data gaps.
By market
Each group has two bars: unweighted and weighted. A group’s weighted bar leaves out bids with no probability. Bids with no value do not appear as bars; they are listed under data gaps.
Phasing
No movement history yet
Proposed rule, not approved: straight-line, monthly revenue = value × probability ÷ duration in months, from the month of the expected start. Only weighted open bids with an expected start and a whole-month duration are phased, so the months add back to their weighted value. It is an expected value, not contracted revenue or cash. The current register has no start or duration columns; the revised layout adds them and the chart fills then.
Simpro quotes
| Quote | Name | Salesperson | Value ex GST | Issued | Due or expiry | Days past | Basis | Action |
|---|
An open quote is stale when its due date has passed. Where a quote has no due date, the derived validity expiry (date issued plus validity days) is used instead, and the table shows which basis each row used. A quote with neither is shown as “no due date recorded”. Simpro due dates are sometimes earlier than the issue date, so they are worth checking.
On the validity basis alone (issued plus 30 days) — quotes worth — are past validity; the due date basis above is what the owner asked for, and the two differ where a quote’s due date is later than its issue date plus 30 days.
This dashboard cannot change Simpro (read-only). The quote’s owner archives it, or converts it to a job, in Simpro, and it drops off at the next refresh. Simpro quotes carry no usable probabilities and are never added to the Bid Register pipeline: the same opportunity may be in both. — open quotes have no value.
Data gaps
| Ref | Title | Bid leader | Status | Value | Register issues |
|---|
| Ref | Title | Bid leader | Status | Value | Close date |
|---|
| Ref | Title | Bid leader | Status | Value | Register issues |
|---|
| Ref | Title | Bid leader | Status | Value | Simpro job number |
|---|
| Ref | Title | Bid leader | Status | Value | Days past close |
|---|
| Ref | Title | Bid leader | Status | Value | Similar to |
|---|
Nothing is dropped silently. Severity ratings are on the Data trust page. Alternatives and duplicates cannot be detected automatically because the register has no grouping field; bids with the same customer and titles sharing at least 60% of their words are listed for the bid team and stay in the totals. A close date that is ambiguous (for example 6/8/2026) is not guessed, so it is shown as written and not tested.
Exceptions
The register is the union of the exceptions raised by each page and by this page. If an area could not be computed because a source failed, one row says so rather than leaving the area out. An id used twice is renumbered and flagged, never dropped. Severity follows the working rule on the severity page, not approved thresholds.
Data checks
— failed
| Entity | Check | Expected | Actual | Difference | Result |
|---|
| Entity | Check | Expected | Actual | Difference | Result |
|---|
Each check recomputes a figure from Xero's own rows and compares it with Xero's total or with another report. The difference is always shown, never rounded away or balanced.
Checks cover profit and loss account rows against Xero section totals, gross and net profit, monthly columns against year to date, the balance sheet, open receivables and payables against the balance sheet, bank summary balances against the balance sheet bank section, and prior-period totals.
Bank balances: Xero reports the balance sheet at a month end, while the bank summary is at the cut-off, so postings between the two would show as a difference. Payables: Xero revalues foreign-currency bills separately, which can leave a residual.
A passing check shows the ledger is internally consistent. It does not show the postings are right or complete.
Close status
| Entity | Period lock date | End-of-year lock date | Balance sheet as at |
|---|
A lock date is evidence that Xero will not accept entries on or before it. It is the only close-status evidence available here, and it is not proof that the period is closed, reviewed or complete. No lock date set means Xero has none, which may mean no period has been closed.
Xero rounds the balance sheet request to a month end, so the balance sheet date can be later than the cut-off.
Simpro to Xero
— requests for claim left out
| Result | Records | Ex GST | Value at issue |
|---|
| Result | Invoice | Customer | Ex GST | Date | Status | Value |
|---|
| Credit note | Credits invoice | Customer | Date | Ex GST | In Xero |
|---|
A Simpro invoice matches a Xero invoice when the invoice number is the same. A match is equal only if ex-GST amount, GST, total, invoice date and paid status also agree; otherwise it falls into one result: amounts differ, date differs, paid in one system only, or not yet authorised in Xero. Voided or deleted in Xero but live in Simpro is its own result.
A Xero number with a letter suffix (for example 2083a) is a near match, never a match. A person has to decide which invoice is the real one, and nothing is approved automatically. Value for a near match is the Xero ex-GST amount.
Simpro requests for claim are not exported to Xero. They appear as progress claims sent, not yet invoiced on the Entity financials page, and are not counted as reconciliation failures here.
A Xero invoice with no Simpro invoice this financial year is reversed by a credit note when it is allocated to an authorised or paid Xero sales credit note of the same ex-GST amount. It is shown separately with the credit note number, has no value at issue, and is not counted as unexplained or as a possible duplicate.
The remaining Xero-only invoices have no Simpro invoice in this year's list and no matching credit note. Simpro can date an invoice before 1 July while Xero dates it later, so check the dates before treating one as a missing Simpro record.
Value at issue: for amount differences, the largest of the ex-GST, GST and total differences; for date differences, paid differences and missing records, the invoice ex-GST value. Coverage is matched-and-equal invoices over in-scope Simpro invoices, by count and by Simpro ex-GST value.
Simpro credit notes are not matched to Xero credit notes (the numbers differ). Each is listed with any Xero sales credit note allocated to the invoice it credits.
Data sources
| Source | System | Rows loaded | Status | Cut short |
|---|---|---|---|---|
| Entities and Xero settings | Xero | — | — | — |
| Profit and loss, year to date | Xero | — | — | — |
| Profit and loss, prior year to date | Xero | — | — | — |
| Profit and loss by month | Xero | — | — | — |
| Profit and loss by month, last year | Xero | — | — | — |
| Balance sheet | Xero | — | — | — |
| Bank account movements | Xero | — | — | — |
| Bank account movements, month to date | Xero | — | — | — |
| Open sales invoices | Xero | — | — | — |
| Open supplier bills | Xero | — | — | — |
| Unallocated credit notes | Xero | — | — | — |
| Sales credit notes, year to date | Xero | — | — | — |
| Sales invoices, financial year | Xero | — | — | — |
| Budget by month | Xero | — | — | — |
| Intercompany journals | Xero | — | — | — |
| Contractors invoices with Nebula Hire | Xero | — | — | — |
| Hire invoices with Nebula Contractors | Xero | — | — | — |
| Intercompany loan balances | Xero | — | — | — |
| Open jobs | Simpro | — | — | — |
| Project jobs invoiced this year | Simpro | — | — | — |
| Cost to complete | Simpro | — | — | — |
| Open quotes | Simpro | — | — | — |
| Invoices this year | Simpro | — | — | — |
| Credit notes | Simpro | — | — | — |
| Requests for claim | Simpro | — | — | — |
| Job cost centres | Simpro | — | — | — |
| Sales bid register | Microsoft 365 | — | — | — |
| Group budget workbook | Microsoft 365 | — | — | — |
| CFO forecast FY27 and FY28 (budget) | Attached file | — | — | — |
Status is the platform's own report for each source. Rows loaded are counted from the loaded data, and are shown as — when a source has not loaded. Cut short means the source reached its row limit, so totals built on it may be understated. Not connected means the source has not been added to this dashboard yet.
To add a source: copy one row of this table, change its title and system, and set the source id in the three data-src attributes; the exceptions register reads this table to find its sources, so nothing else needs changing.
Severity rule and definitions
Freshness, reconciliation coverage and finance close status are three separate things. Freshness says the sources loaded at the cut-off. Coverage says how much Simpro invoicing agrees with Xero. Close status says whether finance has locked the period. A successful refresh does not certify that the accounting is complete or correct.
Reconciliation coverage is the share of Nebula Contractors Simpro invoices (requests for claim excluded) that match a Xero invoice exactly on number, amounts, date and paid status.
All figures are unreviewed system outputs, provisional until a competent person has reviewed them.
Bids are flagged as stale when last reviewed more than — days ago.
Not available yet:
| Simpro cost centre | Jobs | Business unit |
|---|
—
Saved
Claude answers from the headline figures and exceptions on this dashboard only. Unaudited; not advice.
—